The Big Lost Fully Loaded
The whole Baked Potato with the original Copper Basin loop added on.
- Distance
- 118 mi (190 km)
- Climbing
- 7,081 ft (2,158 m)
Take this course offline
Download its map in Goat Maps and you can find the next aid station without a signal.
New in 2026, the Fully Loaded rode everything the Baked Potato did and added the Copper Basin loop, about 18 miles and 1,000 feet of climbing, after the Big Lost rest stop. It started at 7:30 AM in 2026, with the Baked Potato.
The 2026 rider guide set three time cuts. The first was at mile 22, near Wildhorse: miss 9:45 AM and you were sent onto the French Fry. If you weren't at the Copper Basin cut, just before the Big Lost rest stop at mile 61, by 1:00 PM, you finished on the Baked Potato instead. El Diablito, 5.5 miles and about 600 feet of rough climbing, closed at 3:00 PM at mile 96.5, and the rider guide expected that one to catch as much as 15% of the Fully Loaded riders still out there.
aid stations
| mi | Where | Cutoff |
|---|---|---|
| 0 | Champions Meadow (start and finish) | |
| 12 | Trail Creek (top of the climb) | |
| 46.6 | Burma Road | |
| 62 | Big Lost | Sat 1:00 PM |
| 81 | Copper Basin | |
| 91 | Wildhorse | |
| 106.5 | Trail Creek (top of the climb) | |
| 118 | Champions Meadow (start and finish) |